S.No. | Title | Download/Link | Date |
---|---|---|---|
201 | Major Reforms made in Draft Mining Plan Guidelines 2024 issued by Ministry of Coal | Download File size:74.75 KB File Type: PDF | 20/06/2024 |
202 | Union Minister G. Kishan Reddy stresses on faster operationalization of Coal Mines | Download File size:94.51 KB File Type: PDF | 20/06/2024 |
203 | Highest ever Coal Stocks Available at Thermal Power Plants | Download File size:71.9 KB File Type: PDF | 19/06/2024 |
204 | Shri G. Kishan Reddy to launch 10th round of Commercial Coal Mines Auction for 60 Coal Blocks on 21st June | Download File size:89.71 KB File Type: PDF | 19/06/2024 |
205 | Coal Ministry to Launch 10th round of Commercial Coal Block Auction | Download File size:89.71 KB File Type: PDF | 14/06/2024 |
206 | Shri G Kishan Reddy takes charge as Union Minister of Coal and Mines | Download File size:598.75 KB File Type: PDF | 13/06/2024 |
207 | Coal Ministry Conducts Workshop on Environmental and Forest Clearances for Coal Mining | Download File size:211.88 KB File Type: PDF | 10/06/2024 |
208 | Greening the Mines: Coal and Lignite PSUs Lead the Way in Land Restoration and Sustainability | Download File size:896.98 KB File Type: PDF | 04/06/2024 |
209 | Coal Production Grows by 10.15%, Coal Dispatch by 10.35% in May, 2024 Compared to Corresponding Period of Last Year | Download File size:64.59 KB File Type: PDF | 03/06/2024 |
210 | Adequate Availability of Coal at Thermal Power Plants Despite High Demand of Power | Download File size:65.98 KB File Type: PDF | 01/06/2024 |
211 | 7.41 percent Increase in Coal Production in April Compared to Last Year | Download File size:63.01 KB File Type: PDF | 02/05/2024 |