• भारत सरकार
  • Government Of India
  • Screen Reader Access
  • Skip Main Content
  • Search on website
  • Accessibility Dropdown
    • A+
    • A 
    • A-
    • A
    • A
  • Social Medias
    • facebook linkFacebook
    • Instagram Page
    • twitter linkTwitter
    • linkedin linklinkedin
    • threads linkthreads
    • youtube Page
  • Sitemap
    • हिन्दी

national emblem कोयला मंत्रालय Ministry of Coal

Coal Mine Surveillance and Management System
Coal Block Information Portal ( CBIP )( Under PM Gatishakti)
Coal Auction
World Telecommunication Standardization Assembly
Swachh Bharat

Main navigation

  • Home
  • About Us
    • About Ministry
    • Vision
    • Mission
    • Functions and Responsibilities
    • History/Background
    • Ministers Profile
    • Senior Officials Details
    • Organization Chart
    • Agencies under Ministry
    • Who's Who
    • Standard Notes
  • Major Statistics
    • Coal – Indian Energy Choice
    • Monthly Statistics at a Glance
    • Production and Supplies
    • Statistical Report
    • Quarterly Report
    • Estimated Coal Projection
    • Over burden Removal (OBR)
    • Output per Man Shift (OMS)
    • Import and Export
    • Generation of Thermal Power from Raw Coal
    • Coal & Lignite Resource
    • Coal Grades
    • Mission Coking Coal
    • Grading of Coal
    • Coal Evacuation Plan
    • RSR Report
    • Coal Statistics
    • Clearances (EC/FC/WLC/GWC)
  • Organisations
  • Sustainability
    • About SDC
    • Mine Water Utilization
    • Vriksharopan Abhiyan
    • Greening Initiatives
    • Promoting Renewable - Moving towards net zero carbon
    • Eco - Tourism in mining area
    • Air Quality Management
    • Gainful Utilization of Overburden
    • Energy Efficiency Measures
    • Guidelines & Report
    • Videos
  • Nominated Authority
    • About NA
    • Auction/Allotment
    • Allocation Tranche-Wise
    • Compensation Orders
    • Termination Order
    • Scrutiny Committee
    • Production Reviews
    • Operationalisation Reviews
    • Single Window System
    • National Coal Index
    • National Lignite Index
    • Coal Block Information
    • Vacancy
    • Tender
    • Energy Cell
  • Public Information
    • Monthly Summary for Cabinet
    • Minutes of Meetings
      • Standing Linkage Committee (LT)
    • Reports
      • Annual Reports
      • Budget Reports
      • Critical and Super Critical Coal Stocks
      • Other Reports
    • Public Grievance Cell
    • Success Stories
    • Mines summary
    • Advertisements
    • Citizen Charter
    • Action Plan
    • Grant-in-Aid
    • Monthly Reports for Cabinet
    • Paper Laid on the Table
    • Standard Operating Procedure
  • RTI
    • Right To Information Portal
    • PIO Details of Ministry of Coal
    • Proactive disclosures on RTI Act from Ministry of Coal
  • Tenders
  • Media
    • Press Releases (PIB)
    • Press Releases (MOC)
    • Photo Gallery
  • Parliament Q&A
    • Lok Sabha
    • Rajya Sabha
  • Contact Us
    • Contact Us
  • Acts & Policies
  • Coal Gasification
  • Safety in Coal Mines
    • About Safety
    • Safety Staistics
    • Accident Portal
    • Safety Initiatives
  • Technology Roadmap
  • Achievements Flipbook
  • CSR
    • About CSR
    • Guidelines
    • Photo Gallery
  • Central Sector Schemes
  • Chintan Shivir
  • Procurement Projection
    Inner Banner of Coal

    Breadcrumb

    • Home
    • Documents
    • Case Studies
    • Assessment e governance projects

    Assessment Of e-Governance Projects

    Assessment Of e-Governance Projects

    Framework of Assessment

    In order to undertake assessment of project and enable comparision of project performance across projects and across implementation geographies, all projects are assessed on an Assessment Framework which is customised to each project. The broad parameters of assessment – assessing impact on outreach, cost of accessing services, quality of services and overall governance across projects remain the same.

    Assessment Framework used from 2007-08 can be accessed HERE. Assessment Framework used from 2009-10 can be accessed HERE.

    Based Assessment studies carried out from 2007-10 several key learning emerged:

    • The Scope of Impact Assessment needs to be enhanced to include reason for Impact in the Impact Assessment Framework
    • Carry out Baseline studies to understand existing status of G2C Service delivery as well create a baseline for doing impact assessment at a later date
    • Carry out in depth case studies of large and/or successful projects to understand reasons for the variation in impact as well reasons for their success/failure, sustainability, potential for replication etc.

    Accordingly the Assessment Framework was revised to reflect the above. Revised Assessment Framework can be accessed HERE.

    Types of Assessment :

    Three types of Assessment for the e-Governance Projects are carried out:

    Impact Assessment of e-Governance Project

    Impact Assessment is carried out for mature projects which have been delivering citizen services for 1-2 years. The broad parameters of assessment are – Assessing impact on outreach, cost of accessing services, quality of services and overall governance cross projects remain the same.

    Baseline Study on e-Governance Project

    Baseline study is conducted of projects which are either at conceptualisation or at an early stage of implementation. The same framework as the Impact Assessment is applied to the Baseline study. Recommendations made on the basis of this study may be integrated as feedback before actual implementation of computerized services. Also, data collection from the control group (manual users) done before the implementation of the computerised services ensures that there are fewer gaps in the Impact Assessment study, whenever it is conducted since there will be less dependence on recall for the data. The result provides inputs on current problems to be rectified as well as enable projects to set clear goals for targeted benefits.

    Detailed Assessment of e-Governance Project

    A detailed Assessment is conducted for any of the projects for which Impact Assessment has already been conducted, to understand the reasons behind the impact and/or variation in impact across geographies. This helps us to understand how and why different locations show varied impact even though the overall project objectives and implementation models is the same. The winners of the

    National Awards for e-Governance are also chosen across different categories of the awards to study the best practices of these projects.

    Selection of Project

    The selection of the projects is based on the following criteria:

    For state wide projects:

    • The project must be delivering definite G2C/G2B services
    • Implementation of the project must be more that 1 year old
    • The project must cover at least 20% population or 4 districts 

    For nation wide projects:

    • The project must be delivering definite G2C/G2B services
    • Implementation of the project must be more that 1 year old
    • The project must cover at least 25% identified end user population and deliver services from multiple locations 

    Till date the following projects have been assessed:

    COMPLETED ASSESSMENT

    In 2007-08, three national level projects (MCA21, Passport & Income Tax) and three state-level projects (Land Records, Property Registration & Transport) were assessed. (For more detail click here)

    In 2009-10, two Impact Assessment Studies (JnNURM e-Governance Reforms, & Computerization of Commercial Taxes) and one Baseline Study (e-District Mission Mode Project) were conducted for the e-Governance Projects. (For more detail click here)

    CURRENT ASSESSMENT

    In the current phase, five assessment studies on e-Governance Projects are being carried out. The selection of agency is completed and initial meetings with Project Leader and concerned authorities to understand the project and preparation of approach document for the project is in process. 

    Attachment: Download

    Carousel

    • Recruitment in CMPFO
    • India Code
    • Centralized Public Grievance Redress And Monitoring System
    • National Government Services Portal of India
    • Voters Online Services
    • MyVisit
    • MyGov
    • Make In India
    • Prime Minister's National Relief Fund
    • Incredible India
    • Digital India
    • National Portal of India
    • Data portal

    Footer menu

    • Website Policy
    • Help
    • Contact Us
    • Terms and Conditions
    • Feedback
    • Web Information Manager
    • Disclaimer
    • Total Visitors: 11961506
    • Since: 07/22/2021 - 14:47
    Website Content Owned by Ministry of Coal, Government Of India Designed, Developed and Hosted by National Informatics Centre ( NIC )Last Updated: 27 May 2025